CALL US TEXT US

Contractor Demo Debris Hauled from a High-Rise Condo — Near North, Chicago

  • ServiceConstruction Debris Removal
  • LocationChicago — Near North Side
  • PropertyHigh-rise condominium
  • Construction Debris Removal
  • Near North Side
  • March 2026
During: drywall stripped to the studs

Project Summary

One of our contractor accounts was gutting a high-rise condo — walls, closets, kitchen tile and flooring — and needed debris hauled out repeatedly as the demo progressed, through a reserved freight elevator and a strict building schedule. This visit was the second debris run of the project: drywall, studs, tile and old flooring carried out on carts, down the freight elevator and into the truck at the dock. Before-and-after photos went to the contractor with the invoice, as they do on every account job. Contractors on account text us when the pile is ready. We come, we photograph, we invoice monthly.

How This Job Was Priced

Like every job, the crew quoted it onsite: one firm number covering labor, loading, hauling and disposal, agreed before anything moved. No obligation, no surprises. How our pricing works →

See Construction Debris Removal

Quick Job Details

ServiceConstruction debris removal — contractor account
PropertyHigh-rise condominium
AccessReserved freight elevator, loading dock
DisposalDrywall, tile and flooring to C&D facility; metal studs recycled
WhenMarch 2026

Have a job like this?

Book a free onsite estimate — same-day and next-day available Monday through Saturday.