CALL US TEXT US

Contractor Demo Debris Hauled from a High-Rise Condo — Near North, Chicago

  • ServiceConstruction Debris Removal
  • LocationChicago — Near North Side
  • PropertyHigh-rise condominium
  • Construction Debris Removal
  • Near North Side
  • March 2026
During: drywall stripped to the studs (construction debris removal, Near North Side)

Project Summary

One of our contractor accounts was gutting a high-rise condo, walls, closets, kitchen tile and flooring, and needed debris hauled out repeatedly as the demo progressed, through a reserved freight elevator on a strict building schedule.

This visit was the second debris run of the project: drywall, studs, tile and old flooring carried out on carts, down the freight elevator and into the truck at the dock. Before-and-after photos went to the contractor with the invoice, as they do on every account job.

Contractors on account just text us when the pile is ready. We come, we photograph, we invoice monthly. Easy.

How This Job Was Priced

Like every job we do, the crew priced it onsite: one firm number covering the labor, loading, hauling and disposal, agreed before anything moved. No obligation, and no surprises on the invoice. How our pricing works →

See Construction Debris Removal

Quick Job Details

ServiceConstruction debris removal — contractor account
PropertyHigh-rise condominium
AccessReserved freight elevator, loading dock
DisposalDrywall, tile and flooring to C&D facility; metal studs recycled
WhenMarch 2026

Have a job like this?

We'd love to help with yours. Book a free onsite estimate online, or call or text us. Same-day and next-day service are available Monday through Saturday.