Partial Deck Demolition Including Nine Posts — Naperville, IL
Project Summary
This Naperville job kept part of a large backyard deck and removed the rest. The tricky part was the nine support posts, each set in a concrete footing, which had to come out completely so the area could be regraded and seeded. The crew removed the decking, railings and stairs first, then the framing, then dug and pulled each post with its footing. The cut line against the remaining deck was left clean for capping. Everything went on the truck the same day, footings included. Post footings are the part of a deck removal most people underestimate. The crew will tell you onsite whether they can come out by hand.
Before · During · After
How This Job Was Priced
Like every job, the crew quoted it onsite: one firm number covering labor, loading, hauling and disposal, agreed before anything moved. No obligation, no surprises. How our pricing works →
Quick Job Details
| Service | Partial deck demolition and removal |
|---|---|
| Property | Single-family home, backyard |
| Access | Side yard to driveway |
| Disposal | Treated lumber to C&D facility; concrete footings to a heavy-material facility; hardware recycled |
| When | September 2025 |