CALL US TEXT US

Partial Deck Demolition Including Nine Posts — Naperville, IL

  • ServiceDeck Removal & Demolition
  • LocationNaperville
  • PropertySingle-family home, backyard
  • Deck Removal & Demolition
  • Naperville
  • September 2025
Before: the deck section slated for removal, with stairs and railing

Project Summary

This Naperville job kept part of a large backyard deck and removed the rest. The tricky part was the nine support posts, each set in a concrete footing, which had to come out completely so the area could be regraded and seeded. The crew removed the decking, railings and stairs first, then the framing, then dug and pulled each post with its footing. The cut line against the remaining deck was left clean for capping. Everything went on the truck the same day, footings included. Post footings are the part of a deck removal most people underestimate. The crew will tell you onsite whether they can come out by hand.

How This Job Was Priced

Like every job, the crew quoted it onsite: one firm number covering labor, loading, hauling and disposal, agreed before anything moved. No obligation, no surprises. How our pricing works →

See Deck Removal & Demolition

Quick Job Details

ServicePartial deck demolition and removal
PropertySingle-family home, backyard
AccessSide yard to driveway
DisposalTreated lumber to C&D facility; concrete footings to a heavy-material facility; hardware recycled
WhenSeptember 2025

Have a job like this?

Book a free onsite estimate — same-day and next-day available Monday through Saturday.