Partial Deck Demolition in Naperville, IL
About This Partial Deck Demo in Naperville
These Naperville homeowners wanted to keep part of their big backyard deck and say goodbye to the rest, so they called us for a partial deck demolition. The section that was going had stairs, railings and nine support posts, each one set in a concrete footing. All nine had to come out completely so the ground could be regraded and seeded.
The crew took off the decking, railings and stairs first, then the framing, and then dug out each post with its footing. They left a clean cut line along the part of the deck that was staying, ready to be capped. Everything went on the truck the same day, concrete footings and all, and the crew cleaned up before they left.
Concrete post footings are big and heavy, and they take some digging. The crew will look at yours during the free onsite estimate and let you know if they can come out by hand. If they can, we'll dig them out. We got that!
Before · During · After
How This Job Was Priced
Like every job we do, this deck removal started with a free onsite estimate. The crew looked at the deck and the footings and gave one firm price covering the labor, loading, hauling and disposal, so there were no surprises on the receipt. It's a free estimate, no obligation. How our pricing works →
Quick Job Details
| Service | Partial deck demolition and removal |
|---|---|
| Property | Single-family home, backyard |
| Access | Side yard to driveway |
| Disposal | Wood, hardware and concrete footings taken to our recycling partners |
| When | September 2025 |