High-Rise Condo Cleared Through the Freight Elevator — Streeterville, Chicago
Project Summary
A Streeterville condo needed clearing: a couch, living-room chair, rug, mattress and frame, a small treadmill and assorted household items. The building required a freight elevator reservation and a COI. The freight elevator was reserved for the 8–11 a.m. window and the crew cleared the unit inside it. Payment ran on the card on file, so the owner didn't need to be present. High-rise jobs live and die by the elevator window. We book it, we make it, and you don't have to be there.
Before · During · After
How This Job Was Priced
Like every job, the crew quoted it onsite: one firm number covering labor, loading, hauling and disposal, agreed before anything moved. No obligation, no surprises. How our pricing works →
Quick Job Details
| Service | Apartment/condo cleanout |
|---|---|
| Property | High-rise condominium |
| Access | Reserved freight elevator, 8–11 a.m. window |
| Disposal | Treadmill frame and bed frame recycled; couch, mattress and rug to disposal |
| When | May 2026 |